Description
Mild Steel Water Tanks Fabrication and Installation Project Schedule XER
Download now the Primavera P6 XER File Paid
Download now the Primavera P6 XER File Paid
Product Name | Mild Steel Water Tanks Fabrication and Installation Project Schedule XER |
No of Projects | 1 |
Projects | Project 01 |
Total Number Of activities | 200 |
Resource loaded | Yes |
Cost loaded | No |
Duration of Project (days) | 517 |
Location of project if any | Kazakhstan |
Reviews
There are no reviews yet.