P6C05-1 Introduction to Primavera P6: Navigating the Interface, Project Creation, and Key Features for Effective Scheduling [ Basic ]
P6C05-2 Relationships, Lag, WBS, Grouping, Sorting, and Layout [ Basic ]
P6C05-3 Activity Codes Import using Excel to Primavera P6 [ Basic ]
P6C05-4 Resource Management by Creating Resources ,allocation and Productivity [ Basic ]
P6C05-5 Data Centre Office Single Story Building Working Sheet Activity Split Step by Step [ Basic ]
P6C05-6 Working Sheet Prepration for Duration Calculation and Resource productivity for Data Centre Project [ Basic ]
P6C05-7 Importing Activities resources and cost and assigning relationship From Excel to P6 [ Basic ]
P6C05-8 Introduction to BOQ and Baseline Preparation requirements T8 Project [ Lec-01 ]
P6C05-9 Preparation of Working Sheet and Activity Splitting up to Div. 03 T8 Project [ Lec-02 ]
P6C05-10 Activity Splitting or Mapping Complete from BOQ in Excel T8 Project [ Lec-03 ]
P6C05-11 Tower Mapping Tower Wise Splitting Data From BOQ in Excel T8 Project [ Lec-04 ]
P6C05-12 Floor Wise Splitting or Mapping Data sheet Preparation into Excel T8 Project [ Lec-05 ]
P6C05-13 Activity Data Extraction and Activity ID Creation and Codes Assigned T8 Project [ Lec-06 ]
P6C05-14 Creating WBS in Excel and Importing Activities and WBS into P6 T8 Project [ Lec-07 ]
P6C05-15 Duration and resource calculation and Productivity Rates sheet Preparation in Excel [ Lec-08 ]
P6C05-16 Importing Duration and resource assignments from Excel to p6 [ Lec-09 ]
P6C05-17 Importing Resources and assign Relationships and Milestones Creation with Constraints [ Lec-10 ]
P6C05-18 Assigning Relationship for Masonry and Concrete Work [ Lec-11 ]
P6C05-19 Assigning relationship for MEP activities by using Excel and P6 [ Lec-12 ]
P6C05-20 Assigning Relationship of Finishes works [ Lec-13 ]
P6C05-21 Activity ID Space removing Activity codes Assign and Activity Name Correction [ Lec-14 ]
P6C05-22 Procurement Activities from BOQ Data Creation and import to P6 from Excel [ Lec-15 ]