Skip to content
  • Home
  • Blog
    • Recent Posts

      • ??????????
      • ?????? ?????
      • A Complete Guide To Extension of Time Claim
      • Detailed Types of Time Schedules in Construction Projects
      • 10 Common Misconceptions About Construction Schedules

      Categories

      • A (2)
      • Bidding (3)
      • Civil engineering (5)
      • Commissioning and Closing Out (10)
      • Conceptual /Basic Engineering (3)
      • Construction Engineering (2)
      • Contract Management (7)
      • Delay and Claim Management (12)
      • Detailed Engineering (2)
      • Electrical (3)
      • Engineering (1)
      • Feasibility (3)
      • Mechanical (3)
      • Microsoft project (10)
      • Ms Excel (9)
      • Ms Office (24)
      • Plumbing (3)
      • PMDS (10)
      • Primavera p6 (22)
      • Procurement (12)
      • Project Controls and Planning (21)
      • Project Management (5)
      • Project Preliminaries (4)
      • Uncategorized (13)
      • Preparing Claims in Construction: A Complete Guide to Documenting and Managing Disputes

        Preparing Claims in Construction: A Complete Guide to Documenting and Managing Disputes

        June 25, 2024

        0

      • ??????????

        ??????????

        November 30, 2023

        0

      • Pacing Delay

        Pacing Delay

        November 30, 2023

        0

      • The 5 Amazing Expecting Construction Site

        The 5 Amazing Expecting Construction Site

        October 24, 2022

        0

  • Courses
    • Popular Courses

      • Oracle Primavera P6 Free Online Tutorial Complete
        Oracle Primavera P6 Free Online Tutorial Complete
        $25.00
      • Latest Updates Of Oracle Primavera P6 Professional Project Management Software
        Latest Updates Of Oracle Primavera P6 Professional Project Management Software
        $25.00
      • Project Monitoring And Controlling By Using Power BI with Primavera P6
        Project Monitoring And Controlling By Using Power BI with Primavera P6
        $25.00
      • Project Monitoring And Controlling By Using Power BI with Primavera P6
        Project Monitoring And Controlling By Using Power BI with Primavera P6
        $25.00

      Course Dashboard

      • Dashboard
      • Downloads
      • Orders
      • Memberships
      • Bookings
      • Subscriptions
      • Edit Address
      • Edit Account
      Learn Primavera P6
      Master project scheduling and planning with Primavera P6, from beginner to advanced levels.
      Risk Management Training
      Build skills to identify, analyze, and manage risks in real-world projects.
      Delay Analysis Made Simple
      Learn effective delay analysis techniques to keep your projects on track.
      Real-World Tools & Templates
      Get access to Primavera XER templates and hands-on training for practical application.
      Power BI Dashboards
      Create interactive dashboards to visualize and analyze project performance.
  • Appointment
    • Bookings

      • Hourly Booking
      • Weekly Booking
      • Monthly Booking

      Memberships

      • Basic Membership
      • Standard Membership
      • Premium Membership
      • Elite Membership

      Reach us Out

      • Contact Us
      • About Us
      • Get Quote
      • Services
  • Shop
    • Featured products

      • Irrigation Pumping Station Complete Schedule XER Irrigation Pumping Station Complete Schedule XER $50.00 Original price was: $50.00.$20.00Current price is: $20.00.
      • Hydropower (Turbine/Generator) project XER Hydropower (Turbine/Generator) project XER $120.00 Original price was: $120.00.$100.00Current price is: $100.00.
      • Building External Works Project Schedule XER Building External Works Project Schedule XER $30.00 Original price was: $30.00.$10.00Current price is: $10.00.
      • 2 Refurbishment of Building Works Project Schedule XER 2 Refurbishment of Building Works Project Schedule XER $50.00 Original price was: $50.00.$30.00Current price is: $30.00.

      Product categories

      • Assignment File
      • Booking
      • Bridge XER Projects
      • Electrical Projects
      • EOT
      • Files
      • Schedule Comparison
      • Tools
      • Xer Files
      • Xer Files

      Shop Dashboard

      • Dashboard
      • Downloads
      • Orders
      • Memberships
      • Bookings
      • Subscriptions
      • Edit Address
      • Edit Account
      17%SaleHydropower (Turbine/Generator) project XER
      17%SaleDam Project XER
      Monthly-Appointment/Booking
      Weekly-Appointment/Booking
      Hourly-Appointment/Booking
      33%SaleWBS to Activity Code P6-Excel Converter
      25%SaleTransmission-Line-HVAC-400KV-High-Capacity-Transmission-Corridor-Schedule-XER
      25%SaleEOT Sample 02 WIA
      33%SaleEOT Sample 01 TIA
      13%SaleMulti Story Building Project XER with Complete Planning Package
      14%SaleGOLF Course XER Schedules
      50%SaleReady Mix Concrete Batching Plant 6000 Cubic Meter XER Schedule
      11%SalePRIMAVERA-P6-TO-EXCEL-SCHEDULE-COMPARISON-DASHBOARD-PRO-TOOL
      33%SaleUnder and Flyover Bridge Project
      23%SalePRIMAVERA P6 OUT OF SEQUENCE FIXER TOOL
      14%SaleP6 Interview Assignment 03 for Planning Engineer by using Primavera P6 | Building Works
      29%SaleP6 Interview Assignment 02 by using Primavera P6 | Basic Planning Engineer
      30%SalePlanning Engineer Interview Assignment 01
      40%SaleCalculating Earned Schedule Analysis in Excel from Primavera P6 vs. Earned Value Formula Template Sheet
      33%SaleEarned-Value-Analysis-SHEET
      21%SaleProductivity Rates
      33%SalePrimavera P6 Excel Lite Tool
      44%SaleUpdate Progress P6 Excel Tool
      17%Sale.PV=EV Revised Schedule P6 Tool
      20%Sale1-Dangling Activities Detector Tool
      50%Sale1-XER to XLSX Gantt Chart Converter Tool
      29%SaleSchedule Comparison Dashboard XER Tool (1)
      33%SaleDetailed-Schedule-Comparison-Report
      42%SaleAll in one Projects Complete XERs
      10%Sale1- Schedule Analyzer | Primavera P6 and Excel Tool |
      43%SaleComplete Road and Infrastructure Project Schedule XER
      40%Sale7 Different Residential Projects Schedule XER
      25%SaleFacade Works Projects Schedule XER
      36%Sale5 Educational Institutes Projects Schedule XER
      65%Sale2 Bank Project Schedules Complete XER
      33%Sale15 Different Building Projects Complete Schedules XER
      40%Sale2 Refurbishment of Building Works Project Schedule XER
      44%Sale5 Various Villa Projects Schedules XER
      47%SaleRelocations Piping Fabrication Well head and Tanks in Oil and Gas 17 Projects Schedules XER
      30%SaleBarrage Construction Complete Project Schedule XER
      30%SaleService Stations Project Complete Schedule XER
      30%SaleHospital Construction Project Complete XER
      60%SaleMosque Construction Project Complete Schedule XER
      32%Sale8 Hotels Construction Projects Schedule XER
      30%SaleRailway Station Construction Project Schedule XER
      60%SaleMild Steel Water Tanks Fabrication and Installation Project Schedule XER
      67%SaleBuilding External Works Project Schedule XER
      30%SaleAccommodations and Sports Hall Buildings Schedule XER
      70%SaleBoiler Pulverized Fuel Pipes replacement (Shutdown project) Schedule XER
      30%Sale28 Storey High Rise Towers Schedule XER
  • Tools
    • Tools Dashboard

      • Dashboard
      • Downloads
      • Orders
      • Memberships
      • Bookings
      • Subscriptions
      • Edit Address
      • Edit Account
      33%SaleWBS to Activity Code P6-Excel Converter

      WBS to Activity Code P6-Excel Converter

      $15.00 Original price was: $15.00.$10.00Current price is: $10.00.
      Add to cart
      11%SalePRIMAVERA-P6-TO-EXCEL-SCHEDULE-COMPARISON-DASHBOARD-PRO-TOOL

      1-Primavera P6 to Excel Schedule Comparison Dashboard Pro Tool

      $90.00 Original price was: $90.00.$80.00Current price is: $80.00.
      Add to cart
      23%SalePRIMAVERA P6 OUT OF SEQUENCE FIXER TOOL

      Primavera P6 Out of Sequence Fixer Tool

      $30.00 Original price was: $30.00.$23.00Current price is: $23.00.
      Add to cart
      21%SaleProductivity Rates

      Productivity Rates

      $28.00 Original price was: $28.00.$22.00Current price is: $22.00.
      Add to cart
      33%SalePrimavera P6 Excel Lite Tool

      . Primavera P6 Excel Lite Tool

      $60.00 Original price was: $60.00.$40.00Current price is: $40.00.
      Add to cart
      44%SaleUpdate Progress P6 Excel Tool

      .Update progress P6 Excel Tool

      $45.00 Original price was: $45.00.$25.00Current price is: $25.00.
      Add to cart
      17%Sale.PV=EV Revised Schedule P6 Tool

      .PV=EV Revised Schedule P6 Tool

      $120.00 Original price was: $120.00.$100.00Current price is: $100.00.
      Add to cart
      20%Sale1-Dangling Activities Detector Tool

      1-Dangling Activities Detector Tool

      $65.00 Original price was: $65.00.$52.00Current price is: $52.00.
      Add to cart
      50%Sale1-XER to XLSX Gantt Chart Converter Tool

      1-XER to XLSX Gantt Chart Converter Tool

      $30.00 Original price was: $30.00.$15.00Current price is: $15.00.
      Add to cart
      29%SaleSchedule Comparison Dashboard XER Tool (1)

      0-Schedule Comparison Dashboard Xer Tool

      $70.00 Original price was: $70.00.$50.00Current price is: $50.00.
      Add to cart
      33%SaleDetailed-Schedule-Comparison-Report

      0-Detailed Schedule Comparison Report XER TooL

      $60.00 Original price was: $60.00.$40.00Current price is: $40.00.
      Add to cart
      10%Sale1- Schedule Analyzer | Primavera P6 and Excel Tool |

      1- Schedule Analyzer | Primavera P6 and Excel Tool |

      $100.00 Original price was: $100.00.$90.00Current price is: $90.00.
      Add to cart
  • Services
    • Untitled design - 2024-10-12T163507.738
      Untitled design - 2024-10-12T153437.384
      Untitled design - 2024-10-12T152205.504

      Get Services

      • Dashboard
      • Downloads
      • Orders
      • Memberships
      • Bookings
      • Subscriptions
      • Edit Address
      • Edit Account
  • More
    • Bookings

      • Hourly Booking
      • Weekly Booking
      • Monthly Booking

      Memberships

      • Basic Membership
      • Standard Membership
      • Premium Membership
      • Elite Membership

      Reach us Out

      • Contact Us
      • About Us
      • Get Quote
      • Services

      Events

      • Event Calendar
      • Events List
      • This Month Events
      • Todays Event
      image-BMDSBJ.jpg
      indoor-portrait-of-positive-friendly-looking-slim-93WBC7X.jpg
      beautiful-asian-female-model-standing-in-dress-cr-EDULG5G.jpg
      smiling-candid-girl-in-dress-cross-arms-on-chest-AKE5DGT.jpg
Menu
  • Login
  • |
  • Register
0
  • Home
  • Blog
    • Recent Posts

      • ??????????
      • ?????? ?????
      • A Complete Guide To Extension of Time Claim
      • Detailed Types of Time Schedules in Construction Projects
      • 10 Common Misconceptions About Construction Schedules

      Categories

      • A (2)
      • Bidding (3)
      • Civil engineering (5)
      • Commissioning and Closing Out (10)
      • Conceptual /Basic Engineering (3)
      • Construction Engineering (2)
      • Contract Management (7)
      • Delay and Claim Management (12)
      • Detailed Engineering (2)
      • Electrical (3)
      • Engineering (1)
      • Feasibility (3)
      • Mechanical (3)
      • Microsoft project (10)
      • Ms Excel (9)
      • Ms Office (24)
      • Plumbing (3)
      • PMDS (10)
      • Primavera p6 (22)
      • Procurement (12)
      • Project Controls and Planning (21)
      • Project Management (5)
      • Project Preliminaries (4)
      • Uncategorized (13)
      • Preparing Claims in Construction: A Complete Guide to Documenting and Managing Disputes

        Preparing Claims in Construction: A Complete Guide to Documenting and Managing Disputes

        June 25, 2024

        0

      • ??????????

        ??????????

        November 30, 2023

        0

      • Pacing Delay

        Pacing Delay

        November 30, 2023

        0

      • The 5 Amazing Expecting Construction Site

        The 5 Amazing Expecting Construction Site

        October 24, 2022

        0

  • Courses
    • Popular Courses

      • Oracle Primavera P6 Free Online Tutorial Complete
        Oracle Primavera P6 Free Online Tutorial Complete
        $25.00
      • Latest Updates Of Oracle Primavera P6 Professional Project Management Software
        Latest Updates Of Oracle Primavera P6 Professional Project Management Software
        $25.00
      • Project Monitoring And Controlling By Using Power BI with Primavera P6
        Project Monitoring And Controlling By Using Power BI with Primavera P6
        $25.00
      • Project Monitoring And Controlling By Using Power BI with Primavera P6
        Project Monitoring And Controlling By Using Power BI with Primavera P6
        $25.00

      Course Dashboard

      • Dashboard
      • Downloads
      • Orders
      • Memberships
      • Bookings
      • Subscriptions
      • Edit Address
      • Edit Account
      Learn Primavera P6
      Master project scheduling and planning with Primavera P6, from beginner to advanced levels.
      Risk Management Training
      Build skills to identify, analyze, and manage risks in real-world projects.
      Delay Analysis Made Simple
      Learn effective delay analysis techniques to keep your projects on track.
      Real-World Tools & Templates
      Get access to Primavera XER templates and hands-on training for practical application.
      Power BI Dashboards
      Create interactive dashboards to visualize and analyze project performance.
  • Appointment
    • Bookings

      • Hourly Booking
      • Weekly Booking
      • Monthly Booking

      Memberships

      • Basic Membership
      • Standard Membership
      • Premium Membership
      • Elite Membership

      Reach us Out

      • Contact Us
      • About Us
      • Get Quote
      • Services
  • Shop
    • Featured products

      • Irrigation Pumping Station Complete Schedule XER Irrigation Pumping Station Complete Schedule XER $50.00 Original price was: $50.00.$20.00Current price is: $20.00.
      • Hydropower (Turbine/Generator) project XER Hydropower (Turbine/Generator) project XER $120.00 Original price was: $120.00.$100.00Current price is: $100.00.
      • Building External Works Project Schedule XER Building External Works Project Schedule XER $30.00 Original price was: $30.00.$10.00Current price is: $10.00.
      • 2 Refurbishment of Building Works Project Schedule XER 2 Refurbishment of Building Works Project Schedule XER $50.00 Original price was: $50.00.$30.00Current price is: $30.00.

      Product categories

      • Assignment File
      • Booking
      • Bridge XER Projects
      • Electrical Projects
      • EOT
      • Files
      • Schedule Comparison
      • Tools
      • Xer Files
      • Xer Files

      Shop Dashboard

      • Dashboard
      • Downloads
      • Orders
      • Memberships
      • Bookings
      • Subscriptions
      • Edit Address
      • Edit Account
      17%SaleHydropower (Turbine/Generator) project XER
      17%SaleDam Project XER
      Monthly-Appointment/Booking
      Weekly-Appointment/Booking
      Hourly-Appointment/Booking
      33%SaleWBS to Activity Code P6-Excel Converter
      25%SaleTransmission-Line-HVAC-400KV-High-Capacity-Transmission-Corridor-Schedule-XER
      25%SaleEOT Sample 02 WIA
      33%SaleEOT Sample 01 TIA
      13%SaleMulti Story Building Project XER with Complete Planning Package
      14%SaleGOLF Course XER Schedules
      50%SaleReady Mix Concrete Batching Plant 6000 Cubic Meter XER Schedule
      11%SalePRIMAVERA-P6-TO-EXCEL-SCHEDULE-COMPARISON-DASHBOARD-PRO-TOOL
      33%SaleUnder and Flyover Bridge Project
      23%SalePRIMAVERA P6 OUT OF SEQUENCE FIXER TOOL
      14%SaleP6 Interview Assignment 03 for Planning Engineer by using Primavera P6 | Building Works
      29%SaleP6 Interview Assignment 02 by using Primavera P6 | Basic Planning Engineer
      30%SalePlanning Engineer Interview Assignment 01
      40%SaleCalculating Earned Schedule Analysis in Excel from Primavera P6 vs. Earned Value Formula Template Sheet
      33%SaleEarned-Value-Analysis-SHEET
      21%SaleProductivity Rates
      33%SalePrimavera P6 Excel Lite Tool
      44%SaleUpdate Progress P6 Excel Tool
      17%Sale.PV=EV Revised Schedule P6 Tool
      20%Sale1-Dangling Activities Detector Tool
      50%Sale1-XER to XLSX Gantt Chart Converter Tool
      29%SaleSchedule Comparison Dashboard XER Tool (1)
      33%SaleDetailed-Schedule-Comparison-Report
      42%SaleAll in one Projects Complete XERs
      10%Sale1- Schedule Analyzer | Primavera P6 and Excel Tool |
      43%SaleComplete Road and Infrastructure Project Schedule XER
      40%Sale7 Different Residential Projects Schedule XER
      25%SaleFacade Works Projects Schedule XER
      36%Sale5 Educational Institutes Projects Schedule XER
      65%Sale2 Bank Project Schedules Complete XER
      33%Sale15 Different Building Projects Complete Schedules XER
      40%Sale2 Refurbishment of Building Works Project Schedule XER
      44%Sale5 Various Villa Projects Schedules XER
      47%SaleRelocations Piping Fabrication Well head and Tanks in Oil and Gas 17 Projects Schedules XER
      30%SaleBarrage Construction Complete Project Schedule XER
      30%SaleService Stations Project Complete Schedule XER
      30%SaleHospital Construction Project Complete XER
      60%SaleMosque Construction Project Complete Schedule XER
      32%Sale8 Hotels Construction Projects Schedule XER
      30%SaleRailway Station Construction Project Schedule XER
      60%SaleMild Steel Water Tanks Fabrication and Installation Project Schedule XER
      67%SaleBuilding External Works Project Schedule XER
      30%SaleAccommodations and Sports Hall Buildings Schedule XER
      70%SaleBoiler Pulverized Fuel Pipes replacement (Shutdown project) Schedule XER
      30%Sale28 Storey High Rise Towers Schedule XER
  • Tools
    • Tools Dashboard

      • Dashboard
      • Downloads
      • Orders
      • Memberships
      • Bookings
      • Subscriptions
      • Edit Address
      • Edit Account
      33%SaleWBS to Activity Code P6-Excel Converter

      WBS to Activity Code P6-Excel Converter

      $15.00 Original price was: $15.00.$10.00Current price is: $10.00.
      Add to cart
      11%SalePRIMAVERA-P6-TO-EXCEL-SCHEDULE-COMPARISON-DASHBOARD-PRO-TOOL

      1-Primavera P6 to Excel Schedule Comparison Dashboard Pro Tool

      $90.00 Original price was: $90.00.$80.00Current price is: $80.00.
      Add to cart
      23%SalePRIMAVERA P6 OUT OF SEQUENCE FIXER TOOL

      Primavera P6 Out of Sequence Fixer Tool

      $30.00 Original price was: $30.00.$23.00Current price is: $23.00.
      Add to cart
      21%SaleProductivity Rates

      Productivity Rates

      $28.00 Original price was: $28.00.$22.00Current price is: $22.00.
      Add to cart
      33%SalePrimavera P6 Excel Lite Tool

      . Primavera P6 Excel Lite Tool

      $60.00 Original price was: $60.00.$40.00Current price is: $40.00.
      Add to cart
      44%SaleUpdate Progress P6 Excel Tool

      .Update progress P6 Excel Tool

      $45.00 Original price was: $45.00.$25.00Current price is: $25.00.
      Add to cart
      17%Sale.PV=EV Revised Schedule P6 Tool

      .PV=EV Revised Schedule P6 Tool

      $120.00 Original price was: $120.00.$100.00Current price is: $100.00.
      Add to cart
      20%Sale1-Dangling Activities Detector Tool

      1-Dangling Activities Detector Tool

      $65.00 Original price was: $65.00.$52.00Current price is: $52.00.
      Add to cart
      50%Sale1-XER to XLSX Gantt Chart Converter Tool

      1-XER to XLSX Gantt Chart Converter Tool

      $30.00 Original price was: $30.00.$15.00Current price is: $15.00.
      Add to cart
      29%SaleSchedule Comparison Dashboard XER Tool (1)

      0-Schedule Comparison Dashboard Xer Tool

      $70.00 Original price was: $70.00.$50.00Current price is: $50.00.
      Add to cart
      33%SaleDetailed-Schedule-Comparison-Report

      0-Detailed Schedule Comparison Report XER TooL

      $60.00 Original price was: $60.00.$40.00Current price is: $40.00.
      Add to cart
      10%Sale1- Schedule Analyzer | Primavera P6 and Excel Tool |

      1- Schedule Analyzer | Primavera P6 and Excel Tool |

      $100.00 Original price was: $100.00.$90.00Current price is: $90.00.
      Add to cart
  • Services
    • Untitled design - 2024-10-12T163507.738
      Untitled design - 2024-10-12T153437.384
      Untitled design - 2024-10-12T152205.504

      Get Services

      • Dashboard
      • Downloads
      • Orders
      • Memberships
      • Bookings
      • Subscriptions
      • Edit Address
      • Edit Account
  • More
    • Bookings

      • Hourly Booking
      • Weekly Booking
      • Monthly Booking

      Memberships

      • Basic Membership
      • Standard Membership
      • Premium Membership
      • Elite Membership

      Reach us Out

      • Contact Us
      • About Us
      • Get Quote
      • Services

      Events

      • Event Calendar
      • Events List
      • This Month Events
      • Todays Event
      image-BMDSBJ.jpg
      indoor-portrait-of-positive-friendly-looking-slim-93WBC7X.jpg
      beautiful-asian-female-model-standing-in-dress-cr-EDULG5G.jpg
      smiling-candid-girl-in-dress-cross-arms-on-chest-AKE5DGT.jpg
Menu
  • Login
  • |
  • Register
0
Basic Engineering Design Optimized 1

Introduction Engineering drawings are very important as they help engineers to visualize their ideas. However, what makes up an engineering drawing? And how many...

July 9, 2022

The Many Engineering Drawings and Their Importance

Softedemy
Conceptual
0
Basic Engineering Design Optimized

Introduction Here at R&D Tax Savers, we see a lot of companies struggle. They’ve got the engineers, they’ve got the devices—they just don’t have...

July 9, 2022

What is a Basic Engineering Design Package and Why is it Important?

Softedemy
Conceptual
0
Engineering Design Optimized

Introduction The engineering design package you choose for your company has a lot to do with what kinds of projects and designs you will...

July 8, 2022

The Best Engineering Design Package: Learn About the Best CAD Software

Softedemy
Conceptual
0
Mobilization Checklist Optimized 2

Introduction If you’re like most project managers, you know how important it is to keep track of your mobilization Checklist Whether you’re working on...

July 8, 2022

The Ultimate Project Mobilization Checklist for a Successful Project Turnaround in 2022

Softedemy
Mobilization
0
Mobilization Checklist Optimized 1

Introduction Mobilization Checklists are the process of getting everything in place and ready to go for the duration of the project. This includes establishing...

July 8, 2022

Project Mobilization Checklists and How They Save You Time & Money

Softedemy
Mobilization
0
Mobilization Checklist Optimized

Introduction Your company has just won a contract for a new project, and you’re responsible for making sure that everything goes off without a...

July 8, 2022

Project Mobilization Checklist and How It Can Help You Succeed in Business

Softedemy
Mobilization
0
Feasibility Study Optimized 2

Introduction In project management, a feasibility study is a process of determining if a project is viable and ideally suited to be pursued by...

July 7, 2022

Types of Feasibility Studies and their Utility in Project Management

Softedemy
Feasible
0
Feasibility Study Optimized 1

Introduction A feasibility study is an important first step in the development of a construction project. It helps you to determine whether or not...

July 7, 2022

Important Tips for Feasibility Studies and How They Influence the Development of Construction Projects in 2022

Softedemy
Feasible
0
Feasibility Study Optimized

Introduction Feasibility studies are an important step in any construction project, particularly those involving large-scale structures or capital investment. Conducting a feasibility analysis helps...

July 7, 2022

10 Considerations to Make When Conducting a Feasibility Study for a Construction Project

Softedemy
Feasible
0
Bid Optimum

Introduction A construction project can be a positive thing for your business, but it’s also an investment of time and resources. If you’re starting...

July 7, 2022

Construction: How to Win a Bid

Softedemy
Bid
0
  • 1
  • …
  • 11
  • 12
  • 13
  • 14
  • 15
  • …
  • 18

    Categories

    • A
    • Bidding
    • Civil engineering
    • Commissioning and Closing Out
    • Conceptual /Basic Engineering
    • Construction Engineering
    • Contract Management
    • Delay and Claim Management
    • Detailed Engineering
    • Electrical
    • Engineering
    • Feasibility
    • Mechanical
    • Microsoft project
    • Ms Excel
    • Ms Office
    • Plumbing
    • PMDS
    • Primavera p6
    • Procurement
    • Project Controls and Planning
    • Project Management
    • Project Preliminaries
    • Uncategorized

    Tags

    Agile Management Benefits of Project Management Bid blog Change Management chat Civil Claim Close out Closing Out Commissioning Conceptual Contract Cost Control Delay Demobilization Detailed Electrical Work Feasible Financial Planning Google Project Management Logistics and Transport Mechanical Work Microsoft Excel Microsoft Word Mobilization Ms Project P6 Plumbing Work Procurement Process Project Controls Project Management Software Purchasing Receiving Process Resource Management Risk Management Stakeholder Management tips

    Products

    • Hydropower (Turbine/Generator) project XER Hydropower (Turbine/Generator) project XER $120.00 Original price was: $120.00.$100.00Current price is: $100.00.
    • Dam Project XER Dam Project XER $120.00 Original price was: $120.00.$100.00Current price is: $100.00.
    • Monthly-Appointment/Booking Monthly-Appointment/Booking $1,000.00
    • Weekly-Appointment/Booking Weekly-Appointment/Booking $350.00
    • Hourly-Appointment/Booking Hourly-Appointment/Booking From: $80.00

    Featured products

    • WBS to Activity Code P6-Excel Converter WBS to Activity Code P6-Excel Converter $15.00 Original price was: $15.00.$10.00Current price is: $10.00.
    • Boiler Pulverized Fuel Pipes replacement (Shutdown project) Schedule XER Boiler Pulverized Fuel Pipes replacement (Shutdown project) Schedule XER $50.00 Original price was: $50.00.$15.00Current price is: $15.00.
    • PRIMAVERA-P6-TO-EXCEL-SCHEDULE-COMPARISON-DASHBOARD-PRO-TOOL 1-Primavera P6 to Excel Schedule Comparison Dashboard Pro Tool $90.00 Original price was: $90.00.$80.00Current price is: $80.00.
    • Hydropower (Turbine/Generator) project XER Hydropower (Turbine/Generator) project XER $120.00 Original price was: $120.00.$100.00Current price is: $100.00.

    Popular Courses

    • Oracle Primavera P6 Free Online Tutorial Complete
      Oracle Primavera P6 Free Online Tutorial Complete
      $25.00
    • Latest Updates Of Oracle Primavera P6 Professional Project Management Software

      Latest Updates Of Oracle Primavera P6 Professional Project Management Software
      $25.00
    • Project Monitoring And Controlling By Using Power BI with Primavera P6

      Project Monitoring And Controlling By Using Power BI with Primavera P6
      $25.00
    • Project Monitoring And Controlling By Using Power BI with Primavera P6

      Project Monitoring And Controlling By Using Power BI with Primavera P6
      $25.00

    Quick Links

    • Home
    • Blog
    • Courses
    • Services
    • Shop
    • Tools
    • Cart
    • Checkout
    • About
    • Contact

    Site Search

      Contact Us

      • Main Boulevard, New Metro City, Gujrat, Punjab 50000, Pakistan
      • +92-3155537580
      • [email protected]
      • www.softedemy.com
      Facebook Linkedin Youtube Reddit Instagram
      • Copyright © 2025 Softedemy All Rights Reserved

      Privacy Policy | Terms Of Services | Refund Policy | DCMA | Cookie Policy

      • Copyright © 2025 Softedemy All Rights Reserved

      Privacy Policy | Terms Of Services | Refund Policy | DCMA | Cookie Policy

      WhatsApp us