P6 Interview Assignment 03 for Planning Engineer by using Primavera P6 | Building Works

  1. Introduction and Overview
    • Introduction to today’s assignment.
    • Setup and initiation using Excel for planning.
  2. WBS (Work Breakdown Structure)
    • Detailed discussions on WBS Level 3.
    • Understanding the importance of Long Lead Items.
    • Organizing and breaking down WBS.
    • Initiating WBS in an Excel tool.
  3. Resource Management and Allocation
    • Estimation of productivity rates.
    • Labor and equipment resource calculations.
    • Material resource allocation and unit cost setup.
    • Creation of a resource dictionary and productivity rate sheet.
  4. Cost Analysis
    • Project cost verification.
    • Weightage and detailed cost analysis.
    • Organization of cost data.
  5. Detailed Construction Insights
    • Distinguishing between construction and installation.
    • Delving into substructure and superstructure works.
    • Deep dives into specific areas like concrete work, architectural details, mechanical HVAC, plumbing, and electrical systems.
  6. Project Planning and Scheduling
    • Introduction to Procurement Process.
    • Understanding activity codes and their significance.
    • Activity name, ID, and description creation.
    • Duration estimates, activity planning, and importing to Primavera P6.
    • CPM (Critical Path Method) scheduling and project duration exploration.
  7. Advanced Primavera P6 Tools
    • Calendar modifications, default settings, and resource dictionary setups.
    • Resource management considerations and equipment categorization.
    • Contractual milestones, activity ID mapping, and more.
  8. Monitoring and Progress Measurement
    • Assigning and maintaining baselines.
    • Generating early start data and planning S-curves.
    • Extracting monthly manpower values and creating histograms.
    • Critical path identification and its significance.
    • Techniques for monitoring project progress and using a Progress Measurement Sheet (PMS).
  9. Final Steps and Conclusion
    • Filtering, previewing, and printing critical activities.
    • Addressing non-critical activities.
    • Introduction to critical path methodology.
    • Final thoughts and an invitation to upcoming content.

🎥 Delve deeper with our comprehensive video guide below.

Key Sessions Include:

📌 Timestamps:

Interview Assignment 03 for Planning Engineer by using Primavera P6 | Building Works

1:15 – Overview of Today’s Assignment
2:11 – Discussing WBS Level 3 and Long Lead Items
3:09 – Estimation of Productivity Rate and Labor Equipment Resource
4:03 – Allocating Material Resource & Unit Cost
5:04 – Baseline Assignments and Reporting Proficiency
5:55 – Starting the Assignment with Excel
6:45 – Setting up the Spreadsheet and WBS Levels
11:38 – Adjusting Milestone Dates and Remarks
16:28 – Check Project Cost for Verification
17:21 – Weightage and Cost Analysis
17:36 – Organizing Cost Data
17:50 – Breaking Down Work Breakdown Structure (WBS)
18:10 – Introduction to Procurement
18:26 – Distinguishing Construction vs. Installation
18:49 – The Role of Substructure Work
19:00 – Importance of Lead Long Items
19:23 – Work Breakdown Structure Level Three
19:35 – Earthwork in Building Analysis
20:00 – Superstructure Work Overview
20:18 – Understanding Concrete Work
20:38 – Architectural Work Details
21:10 – Mechanical HVAC and Plumbing Walkthrough
21:52 – Electrical Systems Overview
22:06 – Testing and Commissioning
22:55 – Procurement Process Steps
26:00 – Activity Codes & Their Importance
28:48 – Differences Between Activity Codes & ID
32:37 – Creating Activity Names and Descriptions
34:02 – Introduction to Material Resource Codes
34:37 – Updating Pay Item Numbers and Assigning Weights
40:46 – Setting Up Productivity Columns and Rates
44:02 – Introduction to Productivity Rate Sheet
46:04 – Explanation of Hour per Quantity vs. Quantity per Hour
51:33 – Calculating duration and peak availability
53:36 – Organizing sections and clarity enhancement
55:05 – Creating the resource dictionary
55:42 – Introduction to productivity rate
56:04 – Initiating WBS in Excel tool
56:35 – Calendar creation and modification in Primavera P6
57:45 – Adding project details in Primavera P6
59:10 – Default settings and date setup in Primavera P6
1:01:14 – Filtering and setting up the resource dictionary
1:02:37 – Equipment categorization and resource export
1:10:05 – Using WBS (Work Breakdown Structure) Codes
1:11:05 – Organizing Contractual Milestones and Submissions
1:14:04 – Duration Estimates and Activity Planning
1:18:03 – Activity ID Mapping and Importing to Primavera P6
1:19:06 – Resource Management: Next Steps and Considerations
1:23:16 – Finalizing Resource ID and Cost Parameters
1:30:38 – Perform CPM Scheduling
1:41:00 – Exploring Work Sheets and Project Duration
1:43:00 – Recap: Comparing Dates and Duration Adjustments
1:52:40 – Scheduling and understanding the timeline dependencies
1:54:34 – Assigning and maintaining baselines
1:54:58 – Setting Primary baselines and project reflections
1:55:17 – Generating early start and planning weekly costs S Curve
2:09:27 – Finalizing Weekly Early and Late Data Graph
2:11:52 – Extracting Monthly Manpower Values
2:12:24 – Creating a Manpower Histogram
2:16:58 – Preparing for Bulk Commodity
02:28:01 – Interacting with Commodity Levels
02:28:29 – Filtering Critical Activities in Excel
02:29:05 – Identifying Open-Ended Activities
02:31:00 – Filtering Critical Paths & Adjusting Dates
02:32:10 – Previewing and Printing Critical Activities
02:33:10 – Addressing Non-Critical Activities
2:39:10 – Introduction to Critical Path & its Importance
2:41:07 – Techniques to Monitor Project Progress
2:41:58 – Progress Measurement Sheet (PMS) Explained
2:47:35 – Conclusion & Invitation for the Next Content

Who Can Benefit?

  • Planning Engineers
  • Project Management Professionals
  • Project Control
  • Cost Controls

What You Get

  • Excel Sheets: Customizable Excel templates and all supporting files Like XER , PDF and Xlsx files used in the video for practice.
  • By purchasing this Sheet, you are also contributing to Softedemy’s mission. The revenue generated supports our team and resources, allowing us to expand our network and bring you more high-quality products.

 

Let Softedemy’s P6 Interview Assignment 03 for Planning Engineer by using Primavera P6 | Building Works guide you through your next project with ease and efficiency. Order now!

Watch below Video

 

 

 

 

 

 

 

 

 

 

 

 

 

Reviews

There are no reviews yet.

Be the first to review “P6 Interview Assignment 03 for Planning Engineer by using Primavera P6 | Building Works”

Your email address will not be published. Required fields are marked *

Your Shopping cart

Close

P6 Interview Assignment 03 for Planning Engineer by using Primavera P6 | Building Works

Original price was: $35.00.Current price is: $30.00.Add to cart